Linear programming algorithm for solving friction - contact problems of multi - body systems under large displacements 大变位下多体系统摩擦接触问题线性规划求解方法
In this paper , a new dynamic programming algorithm for unconstrained 2d stock cutting problem is presented 摘要本文给出了一种求解无限制板材下料问题的动态规划解法,对该算法的计算复杂度进行了分析。
This paper is to establish a system based on electronic map for motorcade - optimized dispatching , and dynamic programming algorithm is used to realize vehicle dispatching 本文的中心内容是:组建了一个基于电子地图大型车队优化调度及管理系统,并用动态规划算法实现了车辆的智能调度。
This model can be converted into a common multi - objective linear programming , which can be efficiently solved by the corrected z - w method of interactive programming algorithm 通过把这类问题转化为一般的多目标线性规划问题,并利用交互规划的修正z - w法进行求解,从而有效地解决这类问题。
The global random searching ability of adaptive evolutionary programming algorithm and high evolutionary ability by the method in this paper is illustrated by the result of actual power systems 算例表明,论文算法不仅保留了自适应进化规划算法的全局搜索能力,而且还具有高效的进化能力。
Thirdly , the principles of nurbs curve and surface are used to the modeling of complex object , and a protruding quadratic programming algorithm for reconstructing reference points of nurbs curve 第三,采用了nurbs曲线、曲面技术对复杂目标建模,给出了反求nurbs曲线控制点的凸二次规划算法。
The mixed incremental iteration formulas by a linear programming algorithm for elasto - plastic contact problems are shown . secondly , main procedures of meshless methods are reviewed and discussed 介绍了一般弹塑性问题的解法,阐述了弹塑性接触问题的增量初应力-线性规划方法,给出了计算流程。
This paper presents a new interior point nonlinear programming algorithm for optimal power flow problems ( opf ) based on the perturbed kkt conditions of the primal problem with a novel data structure 基于原问题的扰动kkt条件,本文提出了一种带新数据结构的原始对偶内点算法求解电力系统最优潮流问题。
An improved evolutionary programming algorithm for real - valued function optimization is proposed . numerical results illustrate that the proposed algorithm is feasible and effective . 8 针对实值连续函数优化问题,提出了一种改进的进化规划算法并给出了收敛性定理,数值实验表明,所提出的算法是可行的、有效的。
Based on the characteristics of rotary symmetrical aspheric surface , tracks programming algorithm is given , the 2 - dimension removal function is reduced into 1 - dimension , finally the dwell time algorithm is presented 针对气囊抛光加工回转对称非球面的特点,进行抛光路径规划,对去除函数进行降维处理,提出抛光驻留时间的计算方法。