The key techniques for the lianbotan experimental warping project of the lower north main - stem of yellow river are analyzed through the model test concerned respectively 摘要通过模型试验对黄河小北干流连伯滩放淤试验工程的各关键技术分别进行了分析。
Article 3 the term “ water resources ” as referred herein shall mean utilization of artificial means or control of surface or ground waters for the purposes of flood control , tide water defense , irrigation , drainage , leaching of injurious salt , soil conservation , water reservation , silt dredge , water supply , pier construction , navigation , and water power development 第3条(水利事业之定义)本法所称水利事业,谓用人为方法控驭,或利用地面水或地下水,以防洪、御潮、灌溉、排水、洗咸、保土、蓄水、放淤、给水、筑港、便利水运及发展水力。
The analysis show that the project target of detaining the coarse and discharging the fine can be got with the related measures , such as placement of the warping sluice on the concave bank of a bending reach ; arrangement of the overflow weir on a bending reach and reasonable zoning and scientific control of the desilting channels etc 分析表明,采用将放淤闸布设在弯道上段的凹岸、弯道设置溢流堰、淤沙条渠的合理分区和科学调度等措施,可以实现试验工程淤粗排细的目标。